A good rooftop solar proposal begins with a site assessment. The goal is to understand the conditions that affect safety, generation, system layout and project scope before choosing equipment.
Start with the electricity use
Recent bills help establish consumption, tariff structure and the connection type. Ask whether the property has planned load growth, daytime equipment or essential loads that need backup. Monthly bill totals alone are not enough to size a system accurately.
Check the roof and surroundings
The assessment should record usable area, orientation, roof material, condition, access and nearby obstructions. Shadows can move through the day and across seasons, so a quick glance at noon may miss important shading. Structural suitability and waterproofing also need attention before mounting details are finalized.
Review the electrical connection
The main panel, sanctioned load, meter and cable routes influence the system layout. Grid-connected projects also need to account for applicable utility and electrical requirements. The proposal should state what is included in this coordination and what remains subject to approval.
Ask for the design assumptions
A clear proposal explains the system capacity, expected production method, equipment specifications, mounting approach, protections, inclusions, exclusions, commissioning checks and support terms. Compare these items side by side instead of comparing only the price per kilowatt.
Before you decide
Request a written scope based on site findings and your current bill. Any savings estimate is conditional on actual generation, self-consumption, export rules, tariffs and system performance. A professional assessment turns a broad estimate into a project-specific conversation.