EXDELLS · Solar EPC · Rajasthan

PM Surya Ghar Guidance

Understand the rooftop process and what to verify before you commit.

Discuss your site
Start with the real requirements

A system should fit the way this site works.

For eligible residential consumers, PM Surya Ghar is administered through the current national scheme process and the DISCOM serving the electricity connection. EXDELLS can help discuss technical readiness and the questions to confirm. Registration, vendor eligibility, consumer documents, subsidy amount and timing must be checked on the official portal; the scheme rules can change.

Site-specific assessment
Clear scope and assumptions
Commissioning and handover plan
Get an initial estimate
What the work covers

The details that shape your project.

We make the design conversation concrete, so you know what needs to be checked before a final system is proposed.

01

Identify the DISCOM for the exact meter location

02

Review current eligibility and vendor requirements on the official portal

03

Check roof and system suitability before agreeing a scope

04

Keep application and installation details consistent

05

Track approval and commissioning requirements through official channels

A clear path from enquiry to handover

Four stages. One connected scope.

01

Listen

Property, bill, operating hours and the outcome you want.

02

Assess

Roof or site condition, access, shading, connection and constraints.

03

Engineer

System arrangement, equipment, protections, scope and assumptions.

04

Deliver

Installation coordination, commissioning checks and useful handover.

Government programme information

Confirm the current rules at the official source.

Eligibility, vendor requirements, process stages, subsidy value and timing can change. Check the consumer connection’s DISCOM and the national portal before committing to equipment or an application.

Open PM Surya Ghar portal