PM Surya Ghar Guidance
Understand the rooftop process and what to verify before you commit.
Discuss your siteA system should fit the way this site works.
For eligible residential consumers, PM Surya Ghar is administered through the current national scheme process and the DISCOM serving the electricity connection. EXDELLS can help discuss technical readiness and the questions to confirm. Registration, vendor eligibility, consumer documents, subsidy amount and timing must be checked on the official portal; the scheme rules can change.
The details that shape your project.
We make the design conversation concrete, so you know what needs to be checked before a final system is proposed.
Review current eligibility and vendor requirements on the official portal
Check roof and system suitability before agreeing a scope
Keep application and installation details consistent
Track approval and commissioning requirements through official channels
Four stages. One connected scope.
Listen
Property, bill, operating hours and the outcome you want.
Assess
Roof or site condition, access, shading, connection and constraints.
Engineer
System arrangement, equipment, protections, scope and assumptions.
Deliver
Installation coordination, commissioning checks and useful handover.
Confirm the current rules at the official source.
Eligibility, vendor requirements, process stages, subsidy value and timing can change. Check the consumer connection’s DISCOM and the national portal before committing to equipment or an application.